L33LEE wrote:Unsure how there is so much confusion.
From your image, all you needed to do was dig down on the right side, and put the excess dirt off to the side.
No mud stacking was required at all to make a perfect path, a max removed amount of, 1 sled of dirt with laboring should have been required (5 mins) to make this a perfect nice neat path someone pulling a sled could have walked through.
Users browsing this forum: No registered users and 1 guest